Atlantic Sun Airways :: FSPassengers Statistics
 
Flight Id: ASV8114    Flight Date: 2008-10-17    Pilot: Matej Sagmeister
 
Aircraft Name: PMDG 737-900 SEAGull Airways
Aircraft Type: MEJ
Departure: RJAA - New Tokyo Intl - Japan
Arrival: WSSS - Singapore Changi - Singapore
Departure Time: 07:50:00(22:51:00 GMT)
Arrival Time: 12:21:00(06:21:00 GMT)
Passengers: 141
Cargo: 0 lbs
Flight Result: Perfect
Take-Off Weight: 169046 lbs
Landing Weight: 124210 lbs
Take-Off fuel: 45986 lbs
Landing Fuel: 569 lbs
TotalBlockTime: 07:30:25
TotalBlockTimeNight: 00:00:00
TotalAirbornTime: 07:19:53
TotalTimeOnGround: 00:10:47
MaxAltitude: 26069ft
CruiseSpeed: 410 kt
CruiseMachSpeed: 0.65
LandingSpeed: 129 kt
LandingPitch: 4.51"
TouchDownVertSpeedFt: -122.31ft/mn
CaptainSentMayday: 1
CrashFlag: 0
PassengersOpinion: 100%
PassengersOpinionText: -Are pleased to have landed right on schedule.
-Are relieved to have landed safely after the extreme weather they experienced during landing.
-Were in a better mood because they had food.
-Were pleased by the music on ground. A very nice addition to their flying experience.
-Didn't understand why they were required to keep their seatbelts on even after reaching cruise level.
-Were very anxious because of the problem during flight.
-Were relieved to land safely after an emergency.
FailureText:
CasualtiesText:
Pilot Bonus: 796
PilotBonusText: You made a very smooth landing. (+50)
Perfect Flight, no problems and very satisfied passengers. (+150)
You landed at the scheduled airport. (+30)
Precise arrival time at destination.(-00h10:26 difference) (+100)
Long flight (07h19) without using time acceleration, without any problems and with satisfied passengers. (+366)
Extreme weather conditions during approach, but a safe landing and satisfied passengers. (+100)
Pilot Penality: 600
PilotPenalityText: Flight regulations require that you have sufficient fuel reserves upon landing (45 mn); you only had reserves for 00h05 of flight. (-300)
You have declared an emergency without a proper reason. A lot of resources were involved to ensure your safety and this needs to be paid, your company received a bill for $5,000. (-300)